Hydrogeological Survey, Borehole Drilling and Pump Installation

Koforidua, Ghana•Government

About this project

This landmark government water project in Koforidua demonstrates our full-spectrum capabilities in hydrogeological engineering. The project began with comprehensive geophysical surveying using ground-penetrating radar and electrical resistivity tomography to pinpoint optimal drilling locations. Our expert drilling team then completed three boreholes, each reaching depths of 80-120 meters to access reliable aquifers. The installation features state-of-the-art solar submersible pumps, a massive 50,000-liter water storage system, and advanced filtration to ensure water quality. The entire system is powered by a dedicated 20kW solar array, making it completely independent of the grid and ensuring 24/7 operation even during power outages. This project has transformed water access for the government complex and serves as a model for sustainable public infrastructure across Ghana.

The Challenge

The government administrative complex in Koforidua suffered from chronic water shortages, with existing water sources unable to meet the daily demands of hundreds of employees and facility operations. The unreliable supply hindered essential services and administrative functions.

Our Solution

We executed a comprehensive water solution beginning with advanced geophysical surveys to map subsurface water resources. Our team drilled three high-yield boreholes to depths of 80-120 meters, installing solar-powered submersible pumps with a combined flow rate of 15,000 liters per hour. The system includes a 50,000-liter storage reservoir, multi-stage water filtration, and automated control systems for 24/7 operation without grid dependency.

The Impact

The government facility now has an uninterrupted, reliable water supply that serves 500+ workers daily. The solar-powered system has eliminated fuel costs and reduced maintenance by 95%. The project has significantly improved the facility's operational capacity and sets a benchmark for sustainable government infrastructure projects in the Eastern Region.

Project Gallery

Hydrogeological Survey, Borehole Drilling and Pump Installation - Image 1
Hydrogeological Survey, Borehole Drilling and Pump Installation - Image 2
Hydrogeological Survey, Borehole Drilling and Pump Installation - Image 3

Technical Specifications

Boreholes Drilled3
Drilling Depth80-120 meters
Flow Rate15,000 L/hour
Pump TypeSolar Submersible 15kW
Storage Capacity50,000 liters
Power SourceSolar PV System 20kW
FiltrationMulti-stage filtration
People Served500+ daily